Commercial Solar Installation and Battery Backup for Kangarilla General Store

Testimonials

Nathan and his team were incredible.
We had a new battery and solar system put in place for our business, Kangarilla General Store.

He helped us with the grant supplying all the data I need to ensure we secured the grant.

The team were excellent installing it in just three days and managing to squeeze us in when it suited us.

The whole experience from start to finish was flawless.

We are in discussion with the team with some other upgrades. Make sure you talk to the team and find out what would work for you.

— David Eickhoff
This project involved a commercial solar installation with battery backup for Kangarilla General Store in South Australia. NG Elec designed and installed a system to support the site’s high energy demand, improve backup power capability, and make better use of the available roof space.

Why They Came To Us

Kangarilla General Store contacted NG Elec because they were facing an annual electricity bill of approximately $18,000 and wanted to reduce their reliance on the grid without risking business interruptions during blackouts. Because the store is located in the Adelaide Hills, power outages can affect critical operations. The brief was clear: design a future-ready system that could lower energy costs, support the full building during outages, and make the best use of limited roof space.

The Solution

NG Elec designed a commercial solar and battery system around the store’s energy usage, roof layout, and backup power needs.
The installation included 27.5kW of solar, 96kWh of Sigenergy battery storage, a smart gateway system, Tigo optimisers, and the required commercial electrical and switchboard connections.
Tigo optimisers were used to improve solar performance across the available roof sections, while the Sigenergy battery and smart gateway were integrated to support whole-building backup during blackouts.

NG Elec also carefully planned the shutdown periods and electrical works to minimise disruption to the store’s daily operations.

NG Elec team installing solar panels at Kangarilla General Store

The Results

The project was completed over 2 days, giving Kangarilla General Store a more reliable and future-ready energy setup.

The completed system helped the business:

  • Reduce reliance on grid power
  • Improve protection during blackouts
  • Support refrigeration, lighting, and daily trading during outages
  • Make better use of the limited roof space
  • Improve solar generation across different roof sections
  • Strengthen long-term energy security
  • Reduce exposure to high electricity costs

Ready To Reduce Your Business Energy Costs?

If high electricity bills or power outages are affecting your business, NG Elec can design a commercial solar and battery solution that helps protect daily operations and improve long-term energy reliability.